Construction Cost of Assigned Work for STT| $21m [total $85m]
Project Description | LPG Conversion of STT Plant to LPG for power generation [16000m3 LPG storage]
Scope of Design Services | FEED, Design development, Detailed Engineering and Construction Supervision with our Mechanical | Process Partners
10 Horizontally mounted tanks (Bullets: 53mx6.5m DIA) | Extensive earthworks including Blasting | Mound areas for Pressurized tanks covered with fill material | Boiler House | Operators Building | Pipe Racks and Vertical Equipment steel platforms | Roads and associated Civil Works
Scope of Construction Phase Services | Client’s Resident Engineers for all Civil and Marine Works | Site Supervision Field Engineering support | Close out Documentation.