Construction Cost of Assigned Work for STX| $19m [total $75m]
Project Description | LPG Conversion of STX Plant to LPG for power generation [12000m3 LPG storage]
Scope of Design Services | FEED, Design development, Detailed Engineering and Construction Supervision with our Mechanical | Process Partners
8 Horizontally Mounted Tanks (Bullets – 6.5m Diameter x 47m) | Soil Improvement using stone columns and other proprietary soil improvement techniques | Mound areas for Pressurized tanks covered with fill material | Boiler House | Operators Building | Pipe Racks and Vertical Equipment steel platforms | Roads and associated Civil Works
Scope of Construction Phase Services | Client’s Resident Engineers for all Civil and Marine Works | Site Supervision Field Engineering support | Close out Documentation