https://pcaeng.com/projects/buildings-bridges/item/22-intake-channel-bridge-shoaiba-power-plant#sigProId26333b4b7a
Construction Cost of Assigned Work | $8m
Project Description | Road Bridge over the Intake Channel 120m long
Scope of Our Services | Detailed design of the bridges substructure and superstructure
Design of a road bridge (total length 120m) over intake channel with five continuous Spans Post Tensioned beams with 4 girders each span| Concrete Piles piers and abutments | Approach Roads and retaining walls.