https://pcaeng.com/projects/buildings-bridges/item/25-link-bridge-shoiaba-power-plant-stage-iii#sigProId8489fa9b9b
Construction Cost of Assigned Work | $1.1m
Project Description | Stage 2, Phase 1 Expansion of the plant with 3 x 350MW Steam Turbine Units
Scope of Our Services | Detailed Design of Steel Double Deck Foot Bridge
Arcitectural | Civil | Structural design of the link bridge connecting the two control buildings of the Shoaiba Power Plant | Hollow Steel Sections design and detailing | Foundations.