https://pcaeng.com/projects/buildings-bridges/item/23-discharge-channel-bridge-shoaiba-power-plant-stage-iii#sigProId173501b100
Construction Cost of Assigned Work | $3m
Project Description | Road Bridge over the Discharge with total length of 60m
Scope of Our Services | Detailed of the bridges substructure and superstructure
Design of a bridge (total length 40m) over discharge channel with two continuous Spans Post Tensioned beams with 4 girders each | Concrete Piles piers and abutments | Approach Roads and retaining walls.