https://pcaeng.com/projects/buildings-bridges/item/24-yanbu-ii-power-water-plant-discharge-channel-bridge#sigProIdb9774514ad
Construction Cost of Assigned Work | $1.1m
Project Description | 200m Access Road and 30m span bridge above water discharge channel
Scope of Our Services | Detailed Design Post – Tensioned Bridge and 200m access road with mechanically stabilized earth wall
Detailed design of a post tensioned 30m span bridge | Development of in house spreadsheets using MathCAD for the design of the superstructure and abutments of the bridge | Design of approach road embankments using Reinforced Earth [MSE] and berms [riprap]