Construction Cost of Assigned Work | $21m
Project Description | FGD Installations for the Desalination Unit
Scope of Our Services | Detailed Civil Structural Design for the EPC Contractor
Design of Pump House and Neutralization Basin |Flue Gas steel Duct [6x6 duct 400m long] | Electrostatic Participators [20x20mx30m height] FGD Absorbers Towers [concrete square shape towers 15x15m 35m height] Booster Fans Structure | Open channels [oxidation basin]