Construction Cost of Assigned Work | $58m
Project Description | Stage 2, Phase 1 Expansion of the plant with 3 x 350MW Steam Turbine Units
Scope of Our Services | Detailed Civil Structural Design for Saudi Archirodon portion of works
Design of the civil and structural works | Heavy Fuel Tank Area [4 tanks 100000 tons each] | Diesel Tank Area | Water Treatment Area [4 large water tanks] | 160m Chimney foundation | Warehouse | Workshop | Unloading Pumps Booster Station | Chemical Dosing Building | Sewage Treatment Plant | Oily Water Separation Plant |4km Roads network | Site Storm Water Drainage | Site Utilities | Cable Ducts | Pipe racks.