https://pcaeng.com/index.php/projects/power-industrial/item/1-shoaiba-power-plant-extension-stage-iii#sigProId616229b6c1
Construction Cost of Assigned Work | $120m
Project Description | Stage III Expansion of the Plant with 3 x 350MW Steam Turbine Units
Scope of Our Services | Detailed Civil Structural Design for Saudi Archirodon portion of works
Design of the civil and structural works | Auxiliary Industrial Buildings |Heavy Fuel Tank Area 4 tanks 100000 tons each and surrounding area | Water Treatment Area 4 large water tanks | 160m high chimney foundation | Sewage Treatment Plant | Oily Water Separation Plant |4km Roads network | Site Storm Water Drainage | Site Utilities | Cable Ducts | Pipe racks